Thinner & equipment cleaner: Water
Dilution Ratio: Supplied ready for use but may be thinned up to 5% by volume with clean water if required. Avoid overthinning
Drying Times: Base: Dust free: 30min -1hr depending on temperature. Hard dry: 4hrs. Topcoat: Starts to dry in about 10 minutes so working with speed is of outmost importance.
The product can be applied by: Single-jet spray equipment only by experienced applicators at strictly controlled pressure
Spreading Capacity per coat: Depends on film thickness applied, type of texture, surface porosity, imperfections, temperature & wastage during painting.
Basecoat: 12 - 16 m2/ l per coat. Topcoat: Depends on type of application; it is generally about 55 – 140ml/m2 (7 –18m2/ L). Maximum spread rate per coat is obtained at minimum dry film thickness and vice versa.